Exhibition Centre in Sydney


A network of 2400 m of textile ducts manufactured in record time and installed early 2014

With its 25,000 m², the temporary Exhibition Centre of Sydney was a real challenge to meet customer’s expectations.
At all levels, our team had to adapt in order to achieve:

- Develop a complex network with high space constraints
- Adapting to a Bracketing already in place, forcing us to change our standards
- Produce the order in a very short timing

To better meet this constraint of time, manufacturing was done in 2 stages, the first part of the duct (840m) being available within 15 days.

Due to its reactivity, both in terms of engineering and production, ATC was able to achieve this important order in 1 month.