FRENCH AIRFORCE BASE
This project consisted in heating two aircraft maintenance hangars on a French air base.
Objective: maintain a minimum temperature of 8 ° C.
Constraint: very great height space
Some key figures:
- CTA 75000 m3 / h
- Fabric: First
- 1 duct Ø 1700 - length: 50 m
- 2 ducts Ø 1100 - Length 50 m
- Height: 21.5 m
- Heating mode with a ∆T of 20 ° and temperature stability of 8 ° minimum
Objective: maintain a minimum temperature of 8 ° C.
Constraint: very great height space
Some key figures:
- CTA 75000 m3 / h
- Fabric: First
- 1 duct Ø 1700 - length: 50 m
- 2 ducts Ø 1100 - Length 50 m
- Height: 21.5 m
- Heating mode with a ∆T of 20 ° and temperature stability of 8 ° minimum